Live stream preview
6010 Open Root Downhill Vertical Plate- Stick Welding
Stick > Certification Tests • 6m 45s
Pipe Welding downhill is required for many procedures in the oil and gas industry. It helps to start with plate and gradually move to pipe once you have the basics
Up Next in Stick > Certification Tests
-
Stick Welding 6010 1/8" OPEN ROOT PLA...
Practice plate 3g plate 6010 root 7018 fill and cap
3/32" gap and 3/32" land
75-80 amps DCEP
these settings will work on pipe too -
Stick Welding with 5/32" 6010 Open Ro...
Stick Welding with practice plate open root that will get you ready for pipe.
This video shows importance of arc length and rod angle and well and lots of other great tips.
Stick Welding with 5/32" 6010 Open Root Plate Downhill -
Stick Welding 4g 7018 plate Test - Ov...
This video covers stick welding a 4g Plate test using 7018 1/8" electrode 120-125 amps dcep.
Structural Welding Tests often require both 3G and 4G plates.
3/8" thick plates using 1/4" backing and 1/4" gap
22.5 degree bevel